Sweet Waters

The home is prepared

Carpets and drapes are removed and stored, interior areas are covered and protected. Exterior paving and most plants removed.

Underpinning begins

Underpinning holes are dug, lifting pads are poured and the foundation is ready for lifting. (once the rain stopped)

Underpinning completed

After a lift of over 80mm the final exterior pour is completed which encapsulates the original ring foundation.

Jobs done.

3 weeks later the house is re-levelled and the owner is ready to get reinsurance.